4×4 Kitchen Garden potential plans.
First bed built, not filled.
Back of the excel spreadsheet calculations forecast more-or-less $125 per bed construction costs. So far, before soil, I’m at $64. I estimated 24 cubic feet of soil for a 4x4x1.5 fill (4×4=16+(4×2=8)), at $3/cuft, $72+64 = 138. Looks like right now I’m coming in high.
Also, these prices seem TOTALLY OUTRAGEOUS.